10 Akron Street Residences
 |
Braced Excavation In Progress |
Location:
Cambridge, MA
Owner: Harvard University
General Contractor: Bond Brothers
Project Description:
30 ft Deep Braced Excavation for Harvard University Residential Parking Garage. The proposed 300ft x 100ft garage is to be sandwiched between a 100+ year old Cambridge brick sewer main line, and a highly sensitive Harvard steam tunnel. The tight space required a one sided form system for wall placement, with 3 levels of internal cross lot bracing. A detailed bracing removal sequence required complex design coordination with the structural engineer and concrete contractor.
 |
 |
| Sheeting Installation |
First Cut
|
|